K-12 Schools

East Aurora Central School District School District Renovations

Pathfinder is providing mechanical and plumbing engineering for renovations at three school buildings. The buildings and the renovations include:
Parkdale Elementary is a two-story, 120,000 sq. ft. building

  • 51 classroom unit ventilators equipped with demand controlled ventilation for improved energy efficiency and indoor air quality.
  • New roof-mounted unit ventilators with energy recovery systems
  • New air cooled chiller and piping distribution system
  • HVAC system serving the historic school auditorium

East Aurora Middle School is a three-story, 190,000 sq. ft. building

  • Cafeteria kitchen exhaust system that was relocated to make additional space available on the upper floors
  • Air cooled chiller and piping distribution system
  • Four new air handling units, including one roof-mounted. Three of the four units have energy recovery
  • Existing building was hot water; new units were converted to glycol via heat exchanger.

East Aurora High School is a single-story, 220,000 sq. ft. building

  • Existing cafeteria kitchen exhaust and makeup air systems.
  • Air handling unit to serve band room and music classrooms, with all system components selected to minimize sound transmission.
  • Conversion of existing building hydronic hot water system to operate on propylene glycol solution.

View Project Sheet

East Aurora Central School District School District Renovations Image 1
East Aurora Central School District School District Renovations Image 2
East Aurora Central School District School District Renovations Image 3
East Aurora Central School District School District Renovations Image 4